fyi
From: Parker, Dave - TW Southern
Counties [mailto:Dave.Parker@taylorwimpey.com]
Sent: 17 April 2012 11:04
To: Jacky Wilson
Subject: FW: Taylor Wimpey - Old Park Farm,
Waterlooville
Jacky
Please refer to the
response from the EA in respect of the noise
bund.
Could you call me when
you are free
Cheers
Dave
From: Cave, Adam
[mailto:adam.cave@environment-agency.gov.uk]
Sent: 17 April 2012
10:59
To: David
Cox
Cc: Greenwood, Suzanne;
Chris Pendle; Parker, Dave - TW Southern Counties; Woodward,
George
Subject: RE: Taylor
Wimpey - Old Park Farm,
Waterlooville
David,
The noise fence/bund is
not linked to Environment Agency conditions. In principle we support its
removal from the scheme as it will increase the river corridor
width.
Many thanks
Adam
Adam
Cave |
Biodiversity Technical Specialist | Solent Fisheries & Biodiversity
Team
Solent and
South Downs Area |
Romsey District Office | Canal Walk | Romsey
Hampshire | SO51 7LP |
Tel Direct: 01794 832770 | Mobile Tel:
07768055169
GPMS Protective Marking
- NOT PROTECTIVELY
MARKED.
From: David Cox
[mailto:CoxD@rpsgroup.com]
Sent: 16 April 2012
14:16
To: Cave,
Adam
Cc: Greenwood, Suzanne;
Chris Pendle; Parker, Dave - TW Southern Counties
Subject: RE: Taylor
Wimpey - Old Park Farm,
Waterlooville
Click here to
report this email as
spam.
Adam,
Many thanks for your
note.
The project engineer is
happy to remove the ‘hard’ structures from the stream base and sloping banks,
with the pre-planted coir rolls being retained in the scheme to offer some scour
protection on the outside bends of the meanders whilst the vegetation matures.
We will also add to the
scheme the issue relating to the streams base substrate, if no gravels / flints
are encountered when the new stream is excavated we’ll look to import the gravel
material as advised by you. Similarly we’ll replace the riprap gabions with
large cobbles / boulders instead.
As per your advice we
have looked to avoid ‘pinch points’ by maintaining a broad landscaped corridor
for the stream to meander through. We have also got to a position where we no
longer require a noise attenuation bund / fence along the eastern side of the
stream corridor, this has freed up significant space for a generous stream width
(i.e. the “land take” previously caused by the bund would have pinched the space
down in which the stream can sit within). The Planning Authorities are looking
for your confirmation that the EA are happy to see the noise fence / bund
removed from the scheme – could you drop me a note to support this if you’re
happy to do
so?
Regards,
David
From: Cave, Adam
[mailto:adam.cave@environment-agency.gov.uk]
Sent: 15 April 2012
10:51
To: David
Cox
Cc: Greenwood,
Suzanne
Subject: Taylor Wimpey -
Old Park Farm,
Waterlooville
Following our discussion on Friday
and to allow you to make amendments to the design. Please find below my
comments on the proposed river corridor scheme. In general I support the scheme
but request the following amendments.
Removal of hard
engineering elements from the channel design, i.e. use of riprap and gabions.
These techniques should be avoided and only considered were fully justified. A
bio engineering solution would be more suitable in the short term, if there is a
concern regarding potential erosion or scour of the newly created channel.
The high level
principle, which was discussed during the initial site visit, was to avoid
pinch points and encroachment from the development into the stream corridor.
This will avoid the need for hard engineering, allowing the stream to be dynamic
and under go natural processes. This design principle will mean the channel will
have a greater biodiversity potential and is in keeping with Water Framework
Directive principles.
No details of the channel
bed treatment have been supplied. It is recommended that a two stage approach is
taken. The first phase would be, to see if suitable bed material is present in
the newly excavation channel corridor. The type of bed material which is
characteristic of this part of the Wallington catchment is flint and cobbles,
which tend to be of varying
size.
If suitable bed material
is absent, material should be imported to the scheme. Material should be of
local character and reference material should be taken from the adjoining head
water streams. It is recommended that the areas that prescribe riprap on the bed
as part of the current design are replaced with large cobbles/flint, to be dress
with smaller material. Imported material should be irregular in shape, rounded
material should be avoided, and generally this makes marine aggregates
unsuitable. The suitability of the material, namely the size and shape will have
a direct relationship to the invertebrate and fish communities which the channel
will be able to support in the future.
For Environment Agency
schemes my team has sourced material from New Milton Sand & Ballast http://www.nmsb.co.uk/ other local companies
will supply a similar grade
material.
Please do not hesitate to
contact me if you have any further
questions.
Regards
Adam
Adam
Cave |
Biodiversity Technical Specialist | Solent Fisheries & Biodiversity
Team
Solent
and South Downs Area |
Romsey District Office | Canal Walk | Romsey
Hampshire
| SO51 7LP | Tel Direct: 01794 832770 | Mobile Tel:
07768055169
GPMS
Protective Marking
- NOT PROTECTIVELY
MARKED.
Information in this message
may be confidential and may be legally privileged. If you have received this
message by mistake, please notify the sender immediately, delete it and do not
copy it to anyone
else.
We have checked this email
and its attachments for viruses. But you should still check any attachment
before opening it.
We may have to make this
message and any reply to it public if asked to under the Freedom of Information
Act, Data Protection Act or for litigation. Email messages and attachments
sent to or from any Environment Agency address may also be accessed by someone
other than the sender or recipient, for business
purposes.
If we have sent you
information and you wish to use it please read our terms and conditions which
you can get by calling us on 08708 506 506. Find out more about the
Environment Agency at www.environment-agency.gov.uk
This e-mail message
and any attached file is the property of the sender and is sent in confidence to
the addressee only.
Internet
communications are not secure and RPS is not responsible for their abuse by
third parties, any alteration or corruption in transmission or for any loss or
damage caused by a virus or by any other
means.
RPS Planning and
Development Limited, company number: 02947164 (England).
Registered office: Centurion Court, 85
Milton Park Abingdon
Oxfordshire OX14 4RY.
RPS Group Plc web link: http://www.rpsgroup.com
______________________________________________________________________
This
email has been scanned by the Symantec Email Security.cloud service.
For more
information please visit
http://www.symanteccloud.com
______________________________________________________________________
The information contained in
this E-MAIL and any attachments is confidential and intended solely for the
attention and use of the named addressee(s). If you are not the intended
recipient, you may not disclose, copy, distribute or retain this message or any
part of it without the prior agreement or consent of the sender. If you have
received this in error please delete it and inform the sender to avoid
transmission problems for the future.
Taylor Wimpey plc Registered No.
296805 (Group parent company) and Taylor Wimpey UK Limited Registered No.
1392762 (UK Housing company) are each registered in England and Wales with the
registered office at Gate House, Turnpike Road, High Wycombe, Buckinghamshire,
HP12 3NR.